Skip to main content
menu
menu
EN
English
EN
English
GA
Gaeilge
login
Login to Portal
Register
Login to Portal
Register
EirGrid
Home
Consultations
Surveys
Home
Consultations
Kildare Meath Grid Upgrade: Step 4 Consultation on Underground Cable Route Options
Submissions
Kildare Meath Grid Upgrade submission
Observation: Option A - The Red Route
Option A - The Red Route
Unique Reference Number:
EGRD-C10-KMGU4-107
Status:
Submitted
Submission:
Kildare Meath Grid Upgrade submission
Author:
Phillip O'Reilly
Consultation:
Kildare Meath Grid Upgrade: Step 4 Consultation on Underground Cable Route Options
Date Submitted:
14.10.2021 - 13:53
Option A - The Red Route
Chapter:
Option A - The Red Route
I have no comments. Provided the facility is underground.
Share
print
fa-file-pdf