Skip to main content
menu
menu
EN
English
EN
English
GA
Gaeilge
login
Login to Portal
Register
Login to Portal
Register
EirGrid
Home
Consultations
Surveys
Home
Consultations
Kildare Meath Grid Upgrade: Step 4 Consultation on Underground Cable Route Options
Submissions
Kildare Meath Grid Upgrade submission
Observation: Option C - The Orange Option
Option C - The Orange Option
Unique Reference Number:
EGRD-C10-KMGU4-100
Status:
Submitted
Submission:
Kildare Meath Grid Upgrade submission
Author:
James O'Neill
Consultation:
Kildare Meath Grid Upgrade: Step 4 Consultation on Underground Cable Route Options
Date Submitted:
25.11.2021 - 09:50
Option C - The Orange Option
Chapter:
Option C - The Orange Option
Preferred option (1) more user friendly.
Share
print