SONI and EirGrid welcome comments on the annual Proposed Testing Tariff Rates consultation paper from interested parties.
Testing tariffs are applied to Units Under Test (UUT) in the Single Electricity Market (SEM) based on the MW capacity of the generator unit. The tariffs are dependent upon the type of test being carried out and the impact on system security. There are several costs that the Transmission System Operators (TSOs) consider are appropriate for inclusion in the testing tariffs. These costs relate to section F.13 of the Trading and Settlement Code.
Proposed Testing Tariff Rates Consultation Paper for 2026
Primary tabs
SONI and EirGrid welcome comments on the annual Proposed Testing Tariff Rates consultation paper from interested parties.
Testing tariffs are applied to Units Under Test (UUT) in the Single Electricity Market (SEM) based on the MW capacity of the generator unit. The tariffs are dependent upon the type of test being carried out and the impact on system security. There are several costs that the Transmission System Operators (TSOs) consider are appropriate for inclusion in the testing tariffs. These costs relate to section F.13 of the Trading and Settlement Code.
Proposed Testing Tariff for 2026
Páipéar maidir le Rátaí Beartaithe Taraife Tástála